Kubernetes comparison
5 directory providers · 0 current original plans · 8 separate component rates
Original amounts and billing periods are retained. Missing fees, taxes or renewal prices are not invented. Different resources and contract models do not share a price rank.
| Provider and product | Resources | Original price and costs | Source |
|---|---|---|---|
| Scaleway Kapsule Dedicated-16KubernetesCost calculator · History | Control plane replicas: 2, Node limit per cluster: 500FR | Component price, not a configured totalRenewal0.35 EUR / hourVAT excludedContract costs and evidenceRenewal: 0.35 EUR / hour Setup: Not verified Renewal increase: 0.0 % Complete total cost cannot be verified.
Control-plane charge only; worker nodes, volumes, registry and load balancers are additional. A free control plane does not establish a free cluster. Any commitment period needs separate verification. 23 Oct 2026 · 10:50 SHA-256: c53809d914f43f1d595f99218e4c0478177fe4e8ae49343722a2cb903fa21384 | Original offer |
| Scaleway Kapsule Dedicated-4KubernetesCost calculator · History | Control plane replicas: 2, Node limit per cluster: 250FR | Component price, not a configured totalRenewal0.11 EUR / hourVAT excludedContract costs and evidenceRenewal: 0.11 EUR / hour Setup: Not verified Renewal increase: 0.0 % Complete total cost cannot be verified.
Control-plane charge only; worker nodes, volumes, registry and load balancers are additional. A free control plane does not establish a free cluster. Any commitment period needs separate verification. 23 Oct 2026 · 10:50 SHA-256: c53809d914f43f1d595f99218e4c0478177fe4e8ae49343722a2cb903fa21384 | Original offer |
| Scaleway Kapsule Dedicated-8KubernetesCost calculator · History | Control plane replicas: 2, Node limit per cluster: 500FR | Component price, not a configured totalRenewal0.18 EUR / hourVAT excludedContract costs and evidenceRenewal: 0.18 EUR / hour Setup: Not verified Renewal increase: 0.0 % Complete total cost cannot be verified.
Control-plane charge only; worker nodes, volumes, registry and load balancers are additional. A free control plane does not establish a free cluster. Any commitment period needs separate verification. 23 Oct 2026 · 10:50 SHA-256: c53809d914f43f1d595f99218e4c0478177fe4e8ae49343722a2cb903fa21384 | Original offer |
| Scaleway Kapsule MutualizedKubernetesCost calculator · History | Control plane replicas: 1, Node limit per cluster: 150FR | Component price, not a configured totalRenewal0 EUR / hourVAT excludedContract costs and evidenceRenewal: 0 EUR / hour Setup: Not verified Complete total cost cannot be verified.
Control-plane charge only; worker nodes, volumes, registry and load balancers are additional. A free control plane does not establish a free cluster. Any commitment period needs separate verification. 23 Oct 2026 · 10:50 SHA-256: c53809d914f43f1d595f99218e4c0478177fe4e8ae49343722a2cb903fa21384 | Original offer |
| Scaleway Kosmos Dedicated-16KubernetesCost calculator · History | Control plane replicas: 2, Node limit per cluster: 500FR | Component price, not a configured totalRenewal0.4944 EUR / hourVAT excludedContract costs and evidenceRenewal: 0.4944 EUR / hour Setup: Not verified Renewal increase: 0.0 % Complete total cost cannot be verified.
Control-plane charge only; worker nodes, volumes, registry and load balancers are additional. A free control plane does not establish a free cluster. Any commitment period needs separate verification. 23 Oct 2026 · 10:50 SHA-256: c53809d914f43f1d595f99218e4c0478177fe4e8ae49343722a2cb903fa21384 | Original offer |
| Scaleway Kosmos Dedicated-4KubernetesCost calculator · History | Control plane replicas: 2, Node limit per cluster: 250FR | Component price, not a configured totalRenewal0.2544 EUR / hourVAT excludedContract costs and evidenceRenewal: 0.2544 EUR / hour Setup: Not verified Renewal increase: 0.0 % Complete total cost cannot be verified.
Control-plane charge only; worker nodes, volumes, registry and load balancers are additional. A free control plane does not establish a free cluster. Any commitment period needs separate verification. 23 Oct 2026 · 10:50 SHA-256: c53809d914f43f1d595f99218e4c0478177fe4e8ae49343722a2cb903fa21384 | Original offer |
| Scaleway Kosmos Dedicated-8KubernetesCost calculator · History | Control plane replicas: 2, Node limit per cluster: 500FR | Component price, not a configured totalRenewal0.3244 EUR / hourVAT excludedContract costs and evidenceRenewal: 0.3244 EUR / hour Setup: Not verified Renewal increase: 0.0 % Complete total cost cannot be verified.
Control-plane charge only; worker nodes, volumes, registry and load balancers are additional. A free control plane does not establish a free cluster. Any commitment period needs separate verification. 23 Oct 2026 · 10:50 SHA-256: c53809d914f43f1d595f99218e4c0478177fe4e8ae49343722a2cb903fa21384 | Original offer |
| Scaleway Kosmos MutualizedKubernetesCost calculator · History | Control plane replicas: 1, Node limit per cluster: 150FR | Component price, not a configured totalRenewal0.1444 EUR / hourVAT excludedContract costs and evidenceRenewal: 0.1444 EUR / hour Setup: Not verified Renewal increase: 0.0 % Complete total cost cannot be verified.
Control-plane charge only; worker nodes, volumes, registry and load balancers are additional. A free control plane does not establish a free cluster. Any commitment period needs separate verification. 23 Oct 2026 · 10:50 SHA-256: c53809d914f43f1d595f99218e4c0478177fe4e8ae49343722a2cb903fa21384 | Original offer |
No shared price range from at least two providers with the same configuration is evidenced for this selection.
All directory providers in this category
CoffeeSprout
Kubernetes, VPS
Directory entry; price evidence shown separatelyDigitalOcean
Managed databases, GPU cloud, Kubernetes, Object storage, App platforms, VPS
Directory entry; price evidence shown separatelyNine
Kubernetes
Directory entry; price evidence shown separatelyRed Hat
Kubernetes
Directory entry; price evidence shown separatelyUpCloud
Cloud servers, Kubernetes, Object storage
Directory entry; price evidence shown separately